A Leading Foundry reduced 72% of WIP by MUDA Elimination

How a Leading foundry in South India removed Muda and improved its productivity and has drastically improved the throughput. The company underwent an 18 month lean journey under NMPC scheme of Govt. of India. The layout of the factory was changed as per lean philosophy by which material handing was reduced. Single piece flow was established with this layout and there by unwanted WIP has been reduced.

Case Studies - Gated Form

Please share your name and email address.

The case study download link will be sent to your email.